BOOK AN INSPECTION
Call usBook inspection
Garage & carport ceilings

Garage ceilings,
fixed for good.

Three fixed-price packages. Done in two days. Your roller door back on at the end of day one.

Book an inspection
Garage & carport ceilings

Garage ceilings take more punishment than any ceiling in the house: heat, moisture and roller-door vibration. Most collapses we see have no insulation above them at all.

A garage ceiling that has already come down.
A garage ceiling that has already come down.

Warning signs

  • Sagging or dipping sheets
  • Cracks along the joints
  • Popped screws or nails
  • Sagging over the roller door
  • Cornice pulling away from the wall
  • Staining or water marks
Not sure?

Tell us what you’re seeing. If it needs a closer look, one of our experienced team will come out, check the ceiling and roof space, and give you a fixed price in writing.

Packages

Fixed prices, including GST

Essential

$4,060
single · $6,100 double
  • Strip and remove the old ceiling and cornice
  • De-glue, de-nail and de-screw the framing
  • R3.5 ceiling insulation
  • Knauf Sheetrock One, back-blocked joints
  • 3-glue / 6-screw fixing, P18 angles
  • Fibafuse tape, Level 4 finish, cornice
Most popular

Complete

$5,500
single · $7,850 double
  • Everything in Essential
  • Roller doors or panel-lift door removed and refitted
  • Licensed electrician disconnect and reconnect
  • Prime and 2 coats of premium paint to ceiling and cornice
  • 20-year workmanship warranty

Premium

$6,950
single · $9,730 double
  • Everything in Complete
  • Walls, skirting, internal door and architraves painted
  • New LED downlights or LED fluoro-style lights
  • Electrical upgrade and final fit-off
  • 20-year workmanship warranty

Single garage 6 × 3 m, double 6 × 6 m. Larger garages are priced per extra m².

Our garage ceiling system

01
3-glue / 6-screw fixing

Sheets glued and screwed with 32 mm coarse-thread screws, never glue alone.

02
P18 perimeter angles

Steel angles around the edges stop the sheets sagging at the walls.

03
Back-blocked joints

Every joint back-blocked so it doesn’t crack.

04
R3.5 insulation

Takes the heat load off the new ceiling and keeps the garage cooler.

Step by step

The process

  1. Inspection

    One of our experienced team measures up, check the framing and roof space, and photograph everything.

  2. Fixed price in writing

    Choose Essential, Complete or Premium. Say yes and we lock in your date.

  3. Strip and rebuild

    Old ceiling out, framing prepared, insulation in and the new ceiling fixed. Your roller door is back on at the end of day one.

  4. Flush and cornice

    Joints taped with Fibafuse and finished to a Level 4 standard, then the cornice goes up.

  5. Paint and electrical

    On Complete and Premium, a licensed electrician reconnects your lights and we paint.

  6. Clean-up and walkthrough

    We clean up and walk you through the finished garage.

Our work

Recent garage & carport ceiling jobs

Double garage, panel-lift door back on
Double garage, panel-lift door back on
Carport ceiling replaced
Carport ceiling replaced
Double garage, new ceiling and cornice
Double garage, new ceiling and cornice
Double garage, flushed to a Level 4 finish
Double garage, flushed to a Level 4 finish
Double garage, new ceiling flushed
Double garage, new ceiling flushed
Single garage, roller door back on
Single garage, roller door back on
What customers say

Latest Google reviews

★★★★★

“I recently had a ceiling replaced and painted in my garage. Sean’s team did a great job. The work was completed within two days and they left our place clean and tidy once they’d finished. Quality workmanship. All you could ask for from specialist tradespeople. No hesitation in recommending them.”

Susan T. · Google · Oct 2026
★★★★★

“Thanks to Sean and the team for a professional job in replacing my garage ceiling. Absolutely extremely happy with the end result.”

Chris M. · Google · Sep 2026
★★★★★

“Great to deal with. Quality job by quality tradesmen. Very tidy. Highly recommended. Thanks”

Mick D. · Google · Oct 2026
5.0
32 Google reviews · read them →

Questions

Anything else you’d like to know? Call or text us on 0402 252 511.

How long does it take?

Most garages take two days, plus painting where it is included. Roller doors are back on at the end of day one.

How many doors are included?

Complete and Premium include removing and refitting up to 2 roller doors on a single garage, or up to 3 on a double, or 1 panel-lift door.

Is there a warranty?

Complete and Premium packages carry a 20-year workmanship warranty. Materials are covered by the manufacturer’s warranty.

Can I strip the old ceiling out myself?

Yes. Ask us about the owner strip-out option, which takes $300 off a single or $600 off a double.

Start with a conversation.

Tell us about your ceiling, and add a few photos if you can. One of our experienced team will call to talk it through and, if it needs a look, book a time to inspect it. You can also text photos to 0402 252 511.

0402 252 511
adelaide.ceilings@gmail.com

5.0
32 Google reviews · read them →

  1. 1We call youOne of our experienced team talks it through with you.
  2. 2InspectionIf it needs a look, we measure, check the roof space and photograph everything.
  3. 3Fixed price in writingA clear proposal. Say yes and we lock in your date.